The road works will be carried out during the evening hours each night from 9:00pm to 5:00am.
Contractor Windward Roads will carry out the works in connection with the recently installed sewage line.
Motorists are advised to observe traffic signs with respect to a detour.
The contractor apologizes for any inconvenience that these necessary works will have on motorized traffic passing through this area.